Portfolio & BESS Hybridization Assets
PSFV Baza
- Operating PV2.88 MW POI (~3.0 MWp) • ~5.0 GWh/yr
- PV TechnologySingle-axis trackers
- BESS Project3.25 MW / 15.05 MWh (4.6h LFP)
- Est. CAPEX~2.06 M€ (PEM)
- Grid & Sitee-distribución • SET Baza 20 kV
PSFV Caudete
- Operating PV1.78 MW (~2.0 MWp) • ~2.8 GWh/yr
- PV TechnologyFixed-tilt structures
- BESS Project2.00 MW / 6.14 MWh (~3.1h LFP)
- Est. CAPEX~2.09 M€ ex-VAT
- Grid & Sitei-DE • ST Villena 20 kV (2 MWh LFP on-site)
Key Investment & Technical Highlights
Zero Grid-Access Bottleneck
Strictly configured as Co-located GREEN (charging exclusively from solar surplus and curtailment mitigation), requiring zero grid-import capacity under RD 1183/2020.
Engineering Ready-to-File
Preliminary engineering designs (Anteproyectos) completed in November 2026 for both assets; secured land footprint ready for containerized BESS deployment.
SME (PYME) Grant Advantage
Project SPVs qualify as Spanish SMEs (PYME), unlocking a +20% bonus intensity in upcoming IDAE / FEDER storage subsidy calls.
Target Partnership Structures
1. Investors / IPPs / ESCO
Battery-as-a-Service (BaaS), ESCO (100% partner-funded CAPEX), SPV Joint Venture, Tolling Agreement, or Project Finance / Mezzanine (~4.15 M€).
2. BESS OEMs & EPCs
Supply of 4h LFP containers + PCS certified under NTS 2.1 / P.O. 12.2 (0 kW grid-import lock), fixed-price Turnkey EPC, or Vendor Finance.
3. RTM Traders & Optimizers
Route-to-Market (RTM) agreements under Floor Price + Profit Share combining wholesale arbitrage (OMIE / IDC) and REE balancing (aFRR / mFRR).
4. O&M Service Providers
Integrated PV + BESS O&M contract with local field teams in Granada and Albacete (SLA < 2–4 h), 20 kV MV maintenance, and herbicide-free vegetation control.